Water to Wire Supply

Up to 100 MW water to water supply for hydroelectric project.

 

Turbines and Generators

Francis Turbine Unit up to 100 MW

Kaplan Turbine Unit Up to 60 MW

Impulse Turbine Unit up to 60 MW

Bulb Turbine Unit up to 60 MW

Turgo Turbine Unit up to 4 MW

Spare Parts and Custom Design

Turbine Runners

Turbine Water Gates

Pump Impellers

Shafts

Stainless Steel Castings

Large Size Motors (up to 4 MW)

Other Customs Designed Mechanical Components


 


Fast East Power Equipment (FEPE),  is a water to wire supplier for hydroelectric project, either new or rehab project.  FEPE has supplied turbine equipment for over 30 projects in North America and Central America over the past 15 year. FEPE also provide engineering service for turbine upgrades and supply the new designed runners (with CFD Modeling) for the rehab project. The recent rehab project was to provide engineering/supply for four low head (14-18 ft) Francis Turbine Runners for St Anthony Hydroelectric Project, Idaho.  The output of the turbine is 30% more than its original rating, In addition, FEPE also provide spare parts for Turbine Runner, Bearings (Babbit or PTFE), Wicket Gates and Pump Impellers. 


About Our Company

What We Offer