Shavano Hydroelectric Project, Colorado


Project Characters


  • Commissioned in 2015
  • Head Range: 180-190 ft
  • Capacity: 1 x 2.8 MW
  • Model of Turbine: Horizontal Shaft Francis


Special Notes:


  • Extra long draft tube:   The total length for the draft tube is over 100 ft
  • Innovative use of Air Cooler for Generator that help to eliminate the Vent System and keep powerhouse clean